PV Inverter Grid-Metering Meter

Energy metering · Industrial-grade hardware · SimtoLink

Isolated designComponent class
AC 220VTypical supply
EthernetUplink
IndoorEnclosure

What to check before you order

  • It sits on the inverter's grid side or at the collector-line boundary, and it meters exported energy, power factor, and harmonics. The figures are in the table.
  • Modbus and the other ports join PV monitoring, a power-trading terminal, and the dispatch master.
  • GPS time sync keeps events and grid-disturbance records on one clock, which is what a dispute needs.
  • SimtoLink can show a register link for anti-backfeed and coordinated SVG control.

A settlement meter for the inverter

Built for distributed PV, commercial roofs, and agrivoltaic sites, where the grid-connection agreement and the bill both depend on accuracy, the port, and the clock at the metering point.

SimtoLink supplies a grid-acceptance checklist, a CT saturation check, and a note on sampling when the grid is weak. The meter can sit with a three-phase multifunction meter and a power-quality meter.

How the reading is protected

IEC 61000-4 level 4 items are on the record. Ports have surge and reverse-polarity protection. Ground is zoned so a loop or common-mode noise is less likely to move a register. Outdoor and coastal orders can take a higher ingress rating and a corrosion coating.

Parameters and thresholds load as a batch. Selected models store an event or a waveform. OTA carries settings and firmware. Accept the meter with a power-on self-test, a time sync, and a sample of registers. For metering or safety, SimtoLink helps with a third-party metrology submission and the type-test file.

Hardware figures

Typical order, for selection and for a bid clause. For a wider range, a redundant supply, or an intrinsically safe explosion-proof variant, ask SimtoLink for the hardware specification and the installation guide. Order codes can differ slightly; the nameplate and the papers in the box decide.

Item Specification Note
Voltage 3×220/380V Self-powered
Current 1(120)A Anti-theft
Accuracy class Class B IEC 62052
Harmonics 2~54 orders THD analysis
Communication Modbus Dual port
Clock GPS time-sync module Time-of-use tariffs
Pulse Active and reactive pulse output Opto-isolated
Power <3.1 W Single-phase or three-phase
Operating temperature -36~67 ℃ Outdoor meter box
Standard IEC 62053 Type approval

Where the meter is read

Three places this meter is usually proved before it is left on the plant.

Commercial roofs

Self-consumption and the surplus that goes to the grid are metered, which is the figure a green-power consumption report uses.

Collector-line boundary

The sub-array meter is checked against the pad-mount transformer meter, which shows a mismatched string or an inverter that has derated.

Retail and subsidy audit

The clock cannot be rewritten and the energy can be frozen, which is what a regulator's spot check and an audit trail ask for.

Install, ground, and recheck

  • Confirm the supply window and polarity before the meter is powered. Measure the bus and the breaker if the feed is uncertain.
  • Shielded twisted pair, shield at one end, kept off long power-cable runs.
  • Read, write, and trip one threshold against the platform in the lab, then move the meter to the point.
  • Outdoors, let water leave and air move, look at the seal, and keep the lightning earth inside the local rule.
  • Every 6 months, sample the registers and archive the log.

Order, documents, and support

SimtoLink supplies the hardware specification, the outline, a wiring table, and a sample project. Volume orders can include a sample review and a factory inspection. Warranty and calibration follow the contract and the papers in the box.

Need help choosing a PV inverter grid-metering meter?

Ask SimtoLink for the specification, a sample, and volume pricing.

Contact SimtoLink